Fatality Risk Control Program In Hot Strip Mill

Gadhiraju, Bharath Varma (2017) Fatality Risk Control Program In Hot Strip Mill. MTech thesis.

[img]PDF (Restricted upto 25/03/2021)
Restricted to Repository staff only

3739Kb

Abstract

Fatality Risk Control program covers the process flow, checking, corrective and preventive actions along with monitoring and review. The purpose of the Fatality Risk Control Program is to identify the hidden hazards having fatality or serious injury potential which is normally not visible to line managers and mitigation of the hazards through engineering control.
FRCP is the responsibility of all Safety professionals of Tata Steel and all Departments in the Company. Once the FRCP is identified the Chief/ Head is responsible for mitigating the risk within an acceptable timeframe. Delayed or pending FRCPs are immediately escalated. My study focuses on FRCP in Tata Steel’s hot strip mill section, identifying the fatal risk potential and mitigation measures. “No injuries. No fatalities. Period. A lofty goal? Yes. But achievable and necessary. Managers must place a high priority on safety and be willing to live according to safety principles, too.

Item Type:Thesis (MTech)
Uncontrolled Keywords:Fatal Risk; Hierarchy of control; Risk mitigation; control measures.
Subjects:Engineering and Technology > Mechanical Engineering
Divisions: Engineering and Technology > Department of Mechanical Engineering
ID Code:9676
Deposited By:IR Staff BPCL
Deposited On:21 Mar 2019 15:38
Last Modified:21 Mar 2019 15:39
Supervisor(s):Bisoi, G.C.

Repository Staff Only: item control page